For General Contractors

One Trade Partner. Complete Structural Delivery.

Engineering, procurement, prefabrication, and installation under one contract. One point of accountability from structural design through final erection. No scope gaps between separate subs.

One Partner, One Contract,
Four Fewer Coordination Gaps.

Structural Engineering

Timber structural engineering and connection design through WoodCore Engineering, aligned with your project’s structural requirements from day one.

1
Structural engineer reviewing timber connection details on BIM model

Digital Coordination

BIM/VDC-led clash detection, shop drawing review, and installation sequencing, resolved digitally before a beam is lifted.

2
3D BIM clash detection model showing structural coordination

Procurement & Prefabrication

Vendor-neutral procurement and CNC-fabricated assemblies, sequenced and staged for your site logistics and crane schedule.

3
Prefabricated timber panels staged for delivery to construction site

Field Installation

Self-performed erection with crews trained in mass timber crane logistics, prefab panel assembly, and field quality control.

4
Installation crew positioning mass timber panels on active job site

Self-Performed
Field Execution

Your structural scope is only as strong as the crew installing it. QB self-performs with specialized teams trained for mass timber erection, crane-sequenced logistics, and prefab assembly at commercial scale.

Mass timber structure under construction with crane positioning CLT panels BIM coordination model on screen during preconstruction planning Specialized crew installing prefabricated timber framing system Completed mass timber commercial building exterior

CLT panels, glulam beams, and steel connections installed by crews who specialize in structural timber systems. 8–10 workers per floor, trained in crane-assisted placement, connection protocols, and structural alignment. 5–7 days per floor for 10,000 SF.

Learn More

Every lift is pre-planned. Staging, delivery sequencing, and crane schedules are coordinated before the first truck arrives. Fewer site disruptions, fewer delays, and 25–30% fewer deliveries than steel baseline.

See Our Process

Factory-precise wall panels and structural assemblies arrive staged to your site plan. Coordinated installation sequences reduce field labor, cut framing waste by 40–60%, and compress your structural schedule by up to 30%.

Learn More

On-site QA/QC protocols built into every installation sequence. Dedicated safety specialists, regular jobsite checks, and a 15% lower incident rate than steel construction baseline. Every connection verified, every tolerance confirmed.

Meet the Team

Solved Digitally Before
the Crane Arrives

We use 3D modeling and clash detection to identify field conflicts before they become expensive delays. Our shop drawings are the exact blueprint for site reality.

3D clash detection model identifying MEP and structural overlaps Clash detection model

Clash Detection

Clash Detection

Eliminating MEP and structural overlaps.

Learn More
Digital installation sequencing model for pick and placement planning Installation sequencing model

Installation Sequencing

Installation Sequencing

A digital “rehearsal” of every pick and placement.

Learn More
BIM integration model for project management coordination BIM integration model

BIM Integration

BIM Integration

Seamless data sharing with your project management team.

Learn More

Project Showcase

Delivered at Scale for Leading GCs

The Crossings at Conestoga Creek

General Contractor: Benchmark Construction

“QB’s prefab approach reduced our field coordination time dramatically. The panels arrived sequenced and ready to install.”

Preconstruction Manager

Let’s Talk About Your Next Structural Package.

Whether you’re in preconstruction or ready to bid, a 30-minute call with our team will give you a clear picture of scope, timeline, and what QB needs to deliver a competitive proposal.

Talk to an Expert